Devanahalli & the Airport Corridor
The corridor with the clearest infrastructure pipeline in the city.
North Bengaluru is the one corridor where the infrastructure is not speculative — the international airport is already operating, the aerospace and hardware parks are allotted, and the metro extension plus the Peripheral Ring Road both land here. That combination is why land in this belt has been repricing faster than the city average, and also why the parcels being pushed hardest are frequently the ones with the weakest paperwork.
- Kempegowda International Airport and the aerospace / hardware park cluster
- Metro Blue Line extension toward the airport belt
- Peripheral Ring Road Phase 1 — the Tumakuru Road to airport stretch
- STRR connectivity linking Devanahalli, Doddaballapur and Hoskote
- Notified KIADB industrial land in the immediate belt
- ×Airport-belt premiums are frequently quoted off transactions that were never registered at the stated value
- ×Several large parcels here carry agreement-holder rather than owner positions — check who can actually convey
- ×Alignment reservations for the PRR and feeder roads affect specific survey numbers; confirm yours
What is built, what is promised.
Status matters more than the announcement. An operating asset reprices land today; a planned one reprices it when the tender is awarded, which may be years apart.
| Item | Detail | Status |
|---|---|---|
| Kempegowda International Airport | Operational, second terminal and runway commissioned | Operating |
| Metro Blue Line extension | Airport-bound extension, operations targeted around late 2026 | Under construction |
| Peripheral Ring Road Phase 1 | ~19.8 km Tumakuru Road to airport stretch, targeted mid-2027 | Under construction |
| STRR (NH-948A) | Satellite town ring road linking the northern satellite towns | Partly operational |
Price bands are indicative ranges compiled from publicly reported transactions, listing data and our own mandate history in each corridor. They are a comparison aid, not a valuation, and they will not reflect a specific parcel's position. Infrastructure timelines are as publicly announced and routinely move.
Currently mandated.
Send the survey number before you send the advance.
We know this corridor’s specific failure modes — the ones listed above are not generic caution, they are what we have actually found here. A preliminary read is free and takes a couple of days.
Checking a parcel in Devanahalli?
Survey number and village is enough to start.
Start on WhatsApp